Can ‘green’ prenotifications on a final load-discharge list still turn ‘red’?

Yes, that can happen. For example, if a customs inspection or embargo is announced after the cut-off time. The prenotification will remain on the final load-discharge list for the time being; the container will not be loaded or unloaded by the terminal.

Was this post helpful?