Linking/unlinking containers
Linking containers
There are two ways to link containers.
- Select an existing handling / multiple handlings and link these to an existing visit.
- Select an existing visit and add a new or existing handling to it.
Option 1: Select an existing handling and link it to an existing visit.
It is also possible to select multiple handlings at the same time.
- Select the handling(s) that you want to link to an existing visit.
-
Click the Attach to other visit button in the menu bar at the top of the dashboard.
- Click the Attach to other visit button in the pop-up that appears.
- The visits are automatically filtered by the terminal for which the handling was submitted.
- Click the Attach to this visit button to the right of the visit to which you want to link the handling.
Option 2: Select an existing visit and add a new or existing handling to it.
- Click Actions to the right of the visit you want to add a handling to.
- Click Add handling to this visit.
- The handlings are automatically filtered by the terminal to which the visit is scheduled.
-
If you want to add a new handling to the visit, click the Create new handling button at the top right of the dashboard. Complete the required fields and submit the new pre-notification by clicking the Submit pre-notification button at the bottom right of the screen.
- If you want to add an existing handling to the visit, click the Move handling button to the right of the handling you want to add to the visit.
Unlinking containers
To unlink containers from a visit, follow the steps below:
- Select the handling(s) you want to unlink from a visit.
-
Click the Detach from visit button in the menu bar at the top of the dashboard.
- Click the Detach handling button in the pop-up that appears.
Part of