For example, if you see 5/50, this means: 5 handlings are linked to this rotation or visit and 50 containers are notified as the expected number to discharge. As a result, you can see that you can still link multiple handlings to this visit without exceeding the expected number to discharge.
Please note: as soon as the barge goes into operation, actual numbers are shown, for example, 2/40 = 2 containers actually loaded of a total of 40 containers prenotified for loading during this visit.
The numbers after the warning icon indicate how many containers there are issues within the handling status.