How can I make a change after the cut-off?

If changes are required to a final load-discharge list (after the cut-off), this can only be done by contacting the terminal directly. The terminal operator can then reopen the load-discharge list in MCA Barge. After this, the barge operator makes the changes and must then again close the load-discharge list in MCA Barge itself. As soon as all changes have been made, the barge operator closes the load-discharge list by clicking on the “Finalize Load-Discharge list” button.

Was this post helpful?